NOW HIRING!

Neading Remodeling & Home Services, LLC
  • About Us
  • Start Consultation
  • OUR SERVICES
    • Services Summary
    • Attic Conversions
    • Bathroom Remodels
    • Carpentry & Handyman
    • Exterior Home Repairs
    • Kitchen Renovations
  • CAREERS
  • BLOG
  • More
    • About Us
    • Start Consultation
    • OUR SERVICES
      • Services Summary
      • Attic Conversions
      • Bathroom Remodels
      • Carpentry & Handyman
      • Exterior Home Repairs
      • Kitchen Renovations
    • CAREERS
    • BLOG
Neading Remodeling & Home Services, LLC
  • About Us
  • Start Consultation
  • OUR SERVICES
    • Services Summary
    • Attic Conversions
    • Bathroom Remodels
    • Carpentry & Handyman
    • Exterior Home Repairs
    • Kitchen Renovations
  • CAREERS
  • BLOG

Bathroom Renovations

Start Consultation

Guest Bathroom Project: Full Renovation

Before and After

Before and After

Before and After

Before and After

Before and After

Before and After

Before and After

Before and After

Before and After

Before and After

Project Summary

Project Summary

Project Summary

Project Summary

Project Summary


Our client needed to update and reconfigure their outdated bathroom to better suit the needs of their expanding family.


 The pain points:

  • The location of the toilet and the mechanics of the way the pre-existing door swung open blocked easy access to the tub. 
  • It was a tight fit to get into the bathroom and be able to close the door
  • The vanity was not able to be utilized well.
  • The walls were heavily textured and the artistic designs could not be removed without damaging the drywall, so they were stuck with the "jungle" theme. 


 The solution:

  • We took the bathroom down to the studs and foundation
  • Reconfigured the layout to relocate the toilet, and incorporated a pocket door to add more space
  • Installed all new everything: Plumbing, electrical, drywall, soaker tub/rain shower combo, vanity, light fixtures/exhaust fan, toilet, and tile

Project Summary



Guest Bathroom Full Renovation: Average Timeline and Cost

The average timeline for a similar size project generally ranges from 2 - 8 weeks*

The average timeline for a similar size project generally ranges from 2 - 8 weeks*

The average timeline for a similar size project generally ranges from 2 - 8 weeks*

  * Projects can be extended due to wait times for special order items


Making the decision to complete a full remodel of your bathroom can be exciting and daunting at the same time. 


If the layout of your bathroom works, it is much more cost effective and less time consuming to consider doing a "facelift", such as installing a new vanity, mirror, lighting and a new coat of paint. 

The average investment for a similar size project is $15-20K

The average timeline for a similar size project generally ranges from 2 - 8 weeks*

The average timeline for a similar size project generally ranges from 2 - 8 weeks*

  Remodeling a bathroom is a great way to improve your everyday quality of life by creating a space that meets your family's needs and brings you joy. 


It's also a good investment. Upon resale, homeowners typically recoup more than half the total cost of a bathroom renovation completed by a professional contractor. 

Copyright © 2014 - 2023 Neading Remodeling & Home Services, LLC - All Rights Reserved.

901-220-5869

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept